During the work sessions between 2005 and this summer, the Loft had been brought to the condition here.
The roof was leak proof, the floor was replaced, dormers had been added to the east and west, doors had been
added to the north and south ends, and the sheetrock and insulation were in place. [Browse] 2 of 9 [Prev] [Next]