Exterior
image16.jpg
Previous Next
Clark decided on the method for supporting the floor of the terrace. He would bury 3 x 10's in the footings of the shop floor, sheath them on both sides and fill the void with concrete.

We brought the planks from the sawmill and set them up, bracing them to the floor inside the new door on the north end of the Loft.