The first step in the 2009 summer work session was to finish the Loft floors.

Here one can see the two levels of the floor in the Loft. One level floats above the truss chord and the other is near the bottom

This picture also shows the progress on the wall on the north end of the Loft. Local masons had punched a doorway through the stone wall and poured concrete sides, which Heidi plastered. Clark had bought patio doors for both ends of the Loft and we had set those in place.