| The Loft | ![]() | |||||||
| Previous | Next | |||||||
| During the summer of 2008 we also started finishing the walls and door openings in the Loft. Local artisans put the new door fram in the south end and opened the wall in the north end. Heidi started pointing the stone. Note the difference in the south wall at the left of the triangle below the truss. Walls that were not stone received the insulation and sheetrock treatment. | ||||||||