Kitchen and Bath
in the Loft
image10.jpg
Previous Next
In 2009 we set the kitchen cabinets into their final spots, installed the refrigerator, the stove and the dishwasher and the kitchen is ready to be used.

We had also finished the floor in dark stain and varnish and the walls are painted sheetrock.