This picture shows the change started in the first summer of 2006. The beams on the left of the picture are from the lower level and we carried them out here to store until we could reuse them.

When we leveled the floor on the Lower East Side and took the center wall out from between the West Wing and the Upper East Side we brought all the rubble and dirt out to the yard and leveled it off.

Using the larger stones we built a retaining wall along the edge of the property.