The Loft
image4.jpg
Previous Next
When the joists were replaced we salvaged many of the old flooring boards and returned them to serve as a ceiling in the lower West Wing.

During that same winter session Clark decided how to support the steps from the landing to the Loft floor. He cut the runner out of a 12 x 12 beam.

One can also see how we added blocks at the end of the joists to level the ceiling.