Kitchen and Bath
in the Loft
image2.jpg
Previous Next
Not much work was done in the loft in 2006 , but 2007 brought a change. Clark and Heidi decided on the layout of the Loft and work could begin in earnest.

In the northwest corner of the Loft they decided to build a full bath with toilet, shower and vanity. There was not room for that unless the roof was raised with a dormer.

First we removed the slates and lath and then we cut the rafters.