| Kitchen and Bath in the Loft | ![]() | ||||||
| Previous | Next | ||||||
| Not much work was done in the loft in 2006 , but 2007 brought a change. Clark and Heidi decided on the layout of the Loft and work could begin in earnest. In the northwest corner of the Loft they decided to build a full bath with toilet, shower and vanity. There was not room for that unless the roof was raised with a dormer. First we removed the slates and lath and then we cut the rafters. | |||||||