| Kitchen and Bath in the Loft | ![]() | |||||||
| Previous | Next | |||||||
| At the end of the 2007 session Clark bought the windows for this room and installed them. During the 2008 work session we removed the beam across the center of the space and put in the door and built the wall between the bath and the kitchen. Since we were going to put a floor here that floats above the old floor of the Loft, we installed the door above the current floor. | ||||||||