| Kitchen and Bath in the Loft | ![]() | |||||||
| Previous | Next | |||||||
| At the beginning of the the 2009 session, Clark was able to hire masons to put a door through the north end of the Loft. He then built and hung shutters on the outside of the opening , Heidi plastered the concrete frame and we installed glass in the half-moon opening at the top of the wall. | ||||||||